Hey,<br><br>This is awesome!<br><br>Do you guys have any idea what you're looking at in non-labor budget?<br><br>--S<br><br><div class="gmail_quote">On Thu, Aug 13, 2009 at 9:09 AM, jim <span dir="ltr"><<a href="mailto:jim@well.com">jim@well.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;"><br>
   after rachel, lamont, and ted left, andy showed up<br>
and pointed out that the large gray metal box to the<br>
right of the front room's electrical sub-panel was<br>
itself a sub-panel. jim removed the cover so's to make<br>
inspection a little easier.<br>
<br>
   the plan is thus altered with respect to removing<br>
circuit breakers from the front room's sub-panel<br>
(phase 3):<br>
   inspect the newly discovered sub-panel and trace<br>
the supply conductors to whichever circuit breaker in<br>
the bigger sub-panel (i'm guessing a two-pole breaker<br>
in positions 19 and 20).<br>
   if possible, move that two-pole breaker to positions<br>
16 and 17 rather than remove it entirely from the<br>
(bigger) sub-panel.<br>
   leave all the circuit breakers in the newly<br>
discovered sub-panel and trace the circuits they<br>
control along with any that come from the bigger<br>
sub-panel.<br>
<div><div></div><div class="h5"><br>
<br>
<br>
On Wed, 2009-08-12 at 21:32 -0700, Rachel McConnell wrote:<br>
> This evening Jim, Ted, Lamont, and I met at 2169 and Jim came up with<br>
> the following plan:<br>
><br>
> Phase 1: Demolition<br>
> NOTE: first step in any demo is to make sure what you're working on *is<br>
> not energized*.<br>
><br>
> * pull out flex on wall by where old sewing machines were (flex on wall<br>
> is bad)<br>
> * remove flex coming out of light fixtures! (2 places)<br>
> * remove wire mold against back wall<br>
> * remove flex near bathroom wall<br>
> * remove wire mold along side wall in front near small room<br>
> * remove empty pipe across front windows<br>
> * remove rods by sliding glass door<br>
> * remove unused coaxial cable<br>
> * remove pipe w/#8 wire that comes from a 50A fuse, in the middle of the<br>
> space along the ceiling & down a pillar<br>
><br>
><br>
> Phase 2: Investigate/modify<br>
> NOTE: first step here too is, make sure it's *not energized*<br>
><br>
> * pipe by front door with wires sticking out<br>
> * wire mold along left wall with hole & visible wires<br>
> * figure out electrical in dj booth<br>
> * far bathroom light socket<br>
> * near bathroom light & fan<br>
> * overhead tracks - verify what's in them is black/red/green, or what<br>
> * pipe over rear exit door<br>
> * bad sockets between rear exit and little room<br>
> * breaker box on front window wall w/fuses<br>
> * wire from flex to light fixture by front doors<br>
> * lights in stairwell<br>
> * alarm-looking things plugged into janky socket by front breaker box<br>
><br>
><br>
> Phase 3: Breaker boxes<br>
> NOTE: make sure it's *not energized*<br>
><br>
> * fix dead front for rear breaker box (the one outside the door)<br>
> * fix naked copper in a couple of the breakers<br>
> * front breaker box:<br>
>   * pull out all triple and dual breakers<br>
>   * move single & paired breakers to slots 1, 2, 13, 14<br>
>   * get Cutler Hammer dead fronts for the rest<br>
><br>
><br>
> Phase 4: Circuit tracing<br>
> NOTE: MAKE SURE IT IS NOT ENERGIZED FIRST<br>
><br>
> * all wires from front breaker.  sort into plugs & lights, plugs in 1,<br>
> 13; lights in 2, 14<br>
> * wires from rear breaker box, label circuits at both ends<br>
><br>
><br>
> At this point we will be blocked on other teams' plans, including (but<br>
> probably not limited to):<br>
> * floor plan - need this to plan outlets and light switches<br>
> * kitchen/oven - need this to plan circuits<br>
> * bathroom details for light and fan circuit<br>
><br>
> After those are worked out we can make a detailed plan of work and a<br>
> budget for it.<br>
><br>
> Rachel<br>
> _______________________________________________<br>
> Build mailing list<br>
> <a href="mailto:Build@lists.noisebridge.net">Build@lists.noisebridge.net</a><br>
> <a href="https://www.noisebridge.net/mailman/listinfo/build" target="_blank">https://www.noisebridge.net/mailman/listinfo/build</a><br>
><br>
<br>
_______________________________________________<br>
Build mailing list<br>
<a href="mailto:Build@lists.noisebridge.net">Build@lists.noisebridge.net</a><br>
<a href="https://www.noisebridge.net/mailman/listinfo/build" target="_blank">https://www.noisebridge.net/mailman/listinfo/build</a><br>
</div></div></blockquote></div><br><br clear="all"><br>-- <br>Shannon Lee<br>(503) 539-3700<br><br>"Any sufficiently analyzed magic is indistinguishable from science."<br>