If someone could vacuum the eastern half of the floor with the squeegy attachment ( It gets into the grooves in the floor better) that'd be awesome. Also, if someone would continue running a razor blade down the grooves in the floor to knock more of the gross out, it'd help a lot. I've done the between the columns from the kitchen floor to the 4th set of pillars, so everything else needs to be done.<br>
<br>Zedd<br><br><div class="gmail_quote">On Sat, Aug 15, 2009 at 3:14 PM, Lamont Lucas <span dir="ltr"><<a href="mailto:lamont@cluepon.com">lamont@cluepon.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">
<br>I removed almost all of the flex conduit marked for removal and rewired the boxes they were connected to.  I was concentrating on the eastern half, and have not examined the western side.  There is still more demo to be done.<br>
<br>Zedd and I also continued to work on the floors which will need a lot more tlc if we are going to try for a sanding/filling/coating test.  <br><br>I'm gonna leave soon, but zedd I think will continue to rock it.  I'll be back tomorrow at 3 or so as well as all day monday.  I'm planning on returning the shop vac at 8am on monday unless someone else plans on using it<br>
<br><span><div style="font-family: arial,sans-serif; font-size: 12px; color: rgb(153, 153, 153);">-- Sent from my Palm Pre</div><br></span>
<br>_______________________________________________<br>
Build mailing list<br>
<a href="mailto:Build@lists.noisebridge.net">Build@lists.noisebridge.net</a><br>
<a href="https://www.noisebridge.net/mailman/listinfo/build" target="_blank">https://www.noisebridge.net/mailman/listinfo/build</a><br>
<br></blockquote></div><br>