I'm not sure when painting will start. I've had a busy couple of days. I'll be able to make it in for a couple of hours today, but I doubt I'll get everything done that needs to be done to paint. I'd guess that painting won't happen until Sunday at the earliest.<br>
<br>Zedd<br><br><div class="gmail_quote">On Wed, Sep 9, 2009 at 10:39 PM, jim <span dir="ltr"><<a href="mailto:jim@well.com">jim@well.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">
<br>
   in 2169, on the floor, are wires pulled from<br>
the various pipes on the ceiling. it would be<br>
helpful if some of you could coil them up as<br>
owen did this evening (and michael kan has in<br>
the past few days, my thanks to both).<br>
   after removing wires i hooked up lights over<br>
the workshop and classrooms as well as over the<br>
tables outside the classrooms and i hooked up<br>
the power track that runs over the workshop and<br>
classrooms as well as the power track that runs<br>
over the tables outside the classrooms.<br>
<br>
   at this point i need to know where to put<br>
receptacles.<br>
   i also need to know what we'll be doing with<br>
lights. seems to me we'll be taking most or all<br>
of the fluorescent lights down and repositioning<br>
them. assuming so, take the bulbs out before<br>
dicking around with the fixtures.<br>
<br>
   it looks like more work should be done on the<br>
walls and ceiling before painting them. i can<br>
work until the spraygun starts up: when will that<br>
happen?<br>
<br>
<br>
_______________________________________________<br>
Build mailing list<br>
<a href="mailto:Build@lists.noisebridge.net">Build@lists.noisebridge.net</a><br>
<a href="https://www.noisebridge.net/mailman/listinfo/build" target="_blank">https://www.noisebridge.net/mailman/listinfo/build</a><br>
</blockquote></div><br>