<p>Hi all, first time emailer to this list.</p>
<p>I wanted to pipe in that in typical electrical wiring schemes, black wires are reserved for one phase, and red are reserved for the second phase.  If that is the case, its not a good idea to put all your heavy loads (like power tools) on one phase and all your light loads (like lighting... heh) on the other.  This creates load imbalance, can cause load on your neutral, and violates elecctrical code.   To keep your lighting safe from tripping along with your radial arm saw, simply put it on a seperate circuit.  For extra super added safety, put that circuit in a different load center.  </p>

<p>That's all for now, but i'd like to help out when I get back to california.</p>
<p>Cheers,<br>
Sean is.</p>
<p><blockquote type="cite">On Jun 28, 2010 10:33 AM, "jim" <<a href="mailto:jim@well.com">jim@well.com</a>> wrote:<br><br><br>
   i bought electrical stuff for the dirty shop,<br>
some of which (i hope) is sitting on the top of<br>
the dedicated sub-panel, some of which is in the<br>
storage-rack room.<br>
   the idea is to power all shop lights and<br>
outlets from the sub-panel:<br>
   * run conduit from the sub-panel around the<br>
perimeter of the interior, probably up near the<br>
tops of the walls, dropping pipe down at<br>
various locations to provide outlets and<br>
switches.<br>
   * outlets would be of two types: general<br>
purpose and dedicated. general purpose are<br>
duplexes for light-load hand tools. dedicated<br>
are single receptacles for higher amperage,<br>
in-place tools (e.g. radial arm saw...).<br>
   * lights should be reconfigured, maybe use<br>
some of the existing flourescents but re-hang<br>
them in best locations, maybe install some<br>
fixtures to provide spot lighting for work<br>
areas.<br>
   * switches can be distributed so's to<br>
control work area as well as general lights.<br>
   * there's the idea of having an emergency<br>
shutoff switch, too, possibly one for each<br>
dedicated receptacle and one for each general<br>
purpose circuit.<br>
   * probably good to redo the power track<br>
so's to drop receptacles on cords for use<br>
at the table(s) in the center of the room.<br>
this might entail rehanging one or more<br>
tracks and certainly rewiring so's to power<br>
the tracks from the dedicated sub-panel<br>
rather than from the primary sub-panels that<br>
are currently powering them.<br>
   * note policy is to use "black" circuits<br>
for all receptacles and "red" circuits for<br>
lights and built-in appliances. the point is<br>
to keep lights separate, as the likelihood<br>
of short-circuits is with receptacles: if<br>
there's a short-circuit, it's good that the<br>
lights will still be on.<br>
   * i'm willing to help, including consider<br>
alternate ideas. i don't want to do all the<br>
work; i hope for help. probably i'm the one<br>
to install the conduit and junction boxes<br>
and others are the ones to pull wires,<br>
install receptacles and switches, hang<br>
lights.... this division of labor worked<br>
pretty well with the darkroom (biggest<br>
problem there was coordinating differing<br>
schedules).<br>
<p><font color="#500050"><br><br><br>On Sun, 2010-06-27 at 22:23 -0700, Ben Kochie wrote:<br>> Nice work on the floors.  Next up I would ...</font></p></blockquote></p>