<p dir="ltr">I think typically they are mounted on threaded rod stubs that protrude from the ceiling. I have never really studied our ceiling, is it concrete, wood framing, other? it is annoying to install threaded concrete anchors into a ceiling but doable. Perhaps there is some wood framing or something up there to make things easier. I know WAYS to install stuff to ceilings, what I don't know is if there is any code requirement for how it is done.</p>

<p dir="ltr">Unfortunately I'll be camping on the 26th but if we coordinate & it seems appropriate I could do some preparatory work ahead of time.</p>
<div class="gmail_quote">On Jul 2, 2014 5:52 PM, "Casey Callendrello" <<a href="mailto:c1@caseyc.net">c1@caseyc.net</a>> wrote:<br type="attribution"><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">

  
    
  
  <div text="#000000" bgcolor="#FFFFFF">
    <div>I saw those, and they indeed look
      sweet. I only have one concern: are those hard to mount? I'm wary
      that they're very difficult to safely install. Does anyone have
      experience mounting them in a non-datacenter environment? (read:
      old building with questionable ceilings)<br>
      <br>
      --Casey<br>
      <br>
      <br>
      On 7/2/14, 3:47 PM, rachel lyra hospodar wrote:<br>
    </div>
    <blockquote type="cite">
      <p dir="ltr">There are some sweet wire cable trays kicking around,
        never used, that were in the dj booth stairwell last night.</p>
      <div class="gmail_quote">On Jul 2, 2014 3:44 PM, "Casey
        Callendrello" <<a href="mailto:c1@caseyc.net" target="_blank">c1@caseyc.net</a>> wrote:<br type="attribution">
        <blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">
          Sorry for the short notice - I'll be traveling for the 4th
          holiday.<br>
          <br>
          Tonight is Network Cleanup Night. We're not going to do
          anything crazy -<br>
          just remove anything that looks very bad to an inspector. This
          includes<br>
          <br>
          * Removing dangling Cat-5 from around the space<br>
          * Taking down the rack from it's perch up high<br>
          * Making sure the rack electrical is sweet and clean.<br>
          * Reinstalling enough equipment to make teh internets.<br>
          <br>
          I'll be in the space around 7pm. If you would like to come
          help, that'd<br>
          be great.<br>
          <br>
          As the reboot progresses, there will be two more major tasks:<br>
          <br>
          1) Reconfigure the network hardware, replacing anything that
          is going<br>
          bad, and improving documentation. I anticipate this to take 4
          hours.<br>
          <br>
          2) Run new cat-5 in the space, properly. This will probably
          take about<br>
          12 man-hours.<br>
              * Run proper cable trays or just correctly supported
          semi-permanent<br>
          bundles<br>
              * Provide sufficient network drops throughout the space.<br>
          <br>
          Task 2 is going to be tricky, and will need a lot of work. I
          am<br>
          tentatively scheduling it for Saturday, July 26th. Please
          consider<br>
          helping if you are able.<br>
          <br>
          --Casey<br>
          <br>
          _______________________________________________<br>
          Build mailing list<br>
          <a href="mailto:Build@lists.noisebridge.net" target="_blank">Build@lists.noisebridge.net</a><br>
          <a href="https://www.noisebridge.net/mailman/listinfo/build" target="_blank">https://www.noisebridge.net/mailman/listinfo/build</a><br>
        </blockquote>
      </div>
    </blockquote>
    <br>
  </div>

</blockquote></div>