<div dir="ltr">Rachel,<div><br></div><div>I think jarrod is planning a new shop layout where the scrap rack is outside the dirty shop room entirely? I could be wrong though.  Either way, good thought.</div></div><div class="gmail_extra">

<br><br><div class="gmail_quote">On Thu, Jul 3, 2014 at 8:31 AM, rachel lyra hospodar <span dir="ltr"><<a href="mailto:rachelyra@gmail.com" target="_blank">rachelyra@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">

<p dir="ltr">Hey y'all I stopped by the space the other night and am excited for all the work everyone is doing! I checked out the new dirty shop plans and they look great. I wanted to point out something I noticed, though, that might be annoying down the line - where the chopsaw is in relation to the scrap rack. It's nice to have clear space on both sides of the saw to cut longer boards & things. Perhaps this is a compromise that was made consciously b/c our shop is small? Just thought i'd point it out in case it hadn't been considered.</p>



<p dir="ltr">Xoxxx<br>
R.</p>
<div style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div><div class="h5"><div dir="ltr">i added notes to the pad <a href="https://pad.riseup.net/p/LayoutMeeting" target="_blank">https://pad.riseup.net/p/LayoutMeeting</a> as to what is going to be done on what approximate schedule.<div>


<br></div><div>our attendance was:  piratematt, jarrod, deja, vi, dan, rikke and myself.<br>

<div><br></div><div>basically there will be a bunch of things done that are directly in prep for the inspectors, and a bunch of nice to have kinda stuff that will make the space more awesomer that isn't important enough to be done before the inspections.  the inspection prep is going to be done first.  stove needs removing / kitchen downsized, walls need to be brought up to code, electrical work needs to be done, DJ booth is being removed entirely and the floor patched over, fire exits should be marked clearly, and the room in the water heater should be drywalled and the area around the heater cleared.  </div>




<div><br></div><div>Jarrod and Matt and Rikke are coordinating space purge stuff.  there will be a few dump runs this week of getting rid of general trash stuff and clearing the space. bodies will be needed to move molecules around over the next week.  if anyone wants to show up and help out, piratematt should be here during the day, otherwise myself or jarrod will come after work hours and open.  </div>




</div><div><br></div><div><br></div><div>here are some whiteboards:  </div><div><a href="https://www.dropbox.com/s/xzsegyms7t50uh2/2014-06-29%2017.21.26.jpg" target="_blank">https://www.dropbox.com/s/xzsegyms7t50uh2/2014-06-29%2017.21.26.jpg</a><br>




</div><div><a href="https://www.dropbox.com/s/jwxrkcbvrj8lpwi/2014-06-29%2017.21.16.jpg" target="_blank">https://www.dropbox.com/s/jwxrkcbvrj8lpwi/2014-06-29%2017.21.16.jpg</a><br></div><div><br></div><div>let me know if there are any questions or concerns.</div>




</div>
<br></div></div>_______________________________________________<br>
Build mailing list<br>
<a href="mailto:Build@lists.noisebridge.net" target="_blank">Build@lists.noisebridge.net</a><br>
<a href="https://www.noisebridge.net/mailman/listinfo/build" target="_blank">https://www.noisebridge.net/mailman/listinfo/build</a><br>
<br></div>
</blockquote></div><br></div>