Sweet, I'll check this out next time I'm in NB (in Toronto for a week and change, so it'll be 2nd week of December, but I'll be thar!)<br><br>Sean<br><br><div class="gmail_quote">On Sun, Nov 28, 2010 at 5:04 PM, jim <span dir="ltr"><<a href="mailto:jim@well.com">jim@well.com</a>></span> wrote:<br>

<blockquote class="gmail_quote" style="margin: 0pt 0pt 0pt 0.8ex; border-left: 1px solid rgb(204, 204, 204); padding-left: 1ex;"><br>
   don't put any wiring _in_ the walls. use EMT (metal<br>
tubing, which is running all over the place and in the<br>
darkroom) so's to run wiring _on_ the walls.<br>
<br>
   what electrical work do you have in mind?<br>
<br>
   there's the shit what needs doing page on the NB<br>
wiki.<br>
<br>
   there's a general plan: improve lights, which means<br>
determining where we want lighting and then moving<br>
fixtures to the right locations and hooking them up.<br>
   i suggest people take ownership of one task and then<br>
ask for help or supplies or whatever to get the task<br>
done.<br>
   note the columns in the center walkway have got EMT<br>
running from an approximate switch location up to the<br>
ceiling. the idea is to determine local lighting and<br>
then run pipe, install boxes, pull wires, and hook up<br>
devices.<br>
   when done there should be a switch for a local light<br>
as well as a receptacle either in the same box as the<br>
switch or in a box close by (e.g. right under the<br>
switch box).<br>
<br>
   i've been slowly running pipe for three-way switches<br>
near the entrances (elevator and top of stairs) to<br>
control lights for the entrance area (as well as a<br>
light or two in the central areas).<br>
   i'm also (slowly) running pipe in the turing class<br>
room for receptacles around the room as well as one or<br>
two switches for ceiling lights. that'll mean<br>
dismantling the existing lights and rehanging them.<br>
   also it'll be good to reposition the ceiling power<br>
strips to be directly over work tables in the center of<br>
the rooms. that way side tables can use receptacles on<br>
the walls and center tables can get power from the<br>
ceiling.<br>
   it'd be great to get some help. i usually find a<br>
little time during weekdays, sometimes early AM,<br>
sometimes late afternoon before evening activities.<br>
<div><div></div><div class="h5"><br>
<br>
<br>
On Sun, 2010-11-28 at 15:19 -0800, Sean Cusack wrote:<br>
> Dr. J - I can help out with lighting and switches. I'm not the best at<br>
> running wires through the walls, but I can terminate stuff in a<br>
> fixture or switch or outlet for sure. Is there a spot on the wiki that<br>
> I can check out to help chip away at projects when I'm in the space?<br>
><br>
> Sean<br>
><br>
> > On Nov 28, 2010 6:04 PM, "jim" <<a href="mailto:jim@well.com">jim@well.com</a>> wrote:<br>
> ><br>
> ><br>
> ><br>
> >   there's a plan: receptacles on black circuits, lights<br>
> > and appliances on red circuits. if you pull wires, always<br>
> > pull a white, black, and red trio and wrap tape around<br>
> > all three of them at the points where they enter and/or<br>
> > leave a box of any kind.<br>
> >   as to 240, do not _just_ grab a red and black without<br>
> > ensuring that they're connected to a two-pole breaker.<br>
> ><br>
> >   the panels are southwest, south east, north center (or<br>
> > northeast), dirty shop, and northwest.<br>
> >   north center is out by the stairs and is split hase.<br>
> > it controls circuits mostly along the north and east walls<br>
> > (and ceiling runs).<br>
> >   north west is in by the member shelves and is three<br>
> > phase. it controls a few circuits in the northwest area<br>
> > and it controls the southwest, southeast, and dirty shop<br>
> > sub-panels.<br>
> ><br>
> >   despite previous and upcoming reimbursements, I've<br>
> > chipped in hundreds of dollars of electrical parts. I<br>
> > don't mind, but I expect them to be used at Noisebridge<br>
> > and no where else. parts are in the closet where the<br>
> > rack is.<br>
> >   don't buy electrical parts from hardware stores: buy<br>
> > them at electrical suppliers such as B and K on division<br>
> > near mission because electrical suppliers have all of<br>
> > the right stuff at 1/3 the cost of hardware stores.<br>
> >   I have a stash of my personal electrical tools and<br>
> > parts in the turing classroom, and those are off limits<br>
> > to Noisebridge personages: I need them when I run off<br>
> > to jobs.<br>
> ><br>
> >   I'll be very grateful for help and also for<br>
> > coordination. please stick to the plan re colors of wires,<br>
> > and please install things up to code. I'm very happy to<br>
> > help and/or explain and/or inspect.... I worry that some<br>
> > shoddy work may trigger inquiries that could be more<br>
> > than embarrassing: possible real costs incurred.<br>
> >   there are a few items on the shit to do list and a<br>
> > great many more things, notably lighting, that should<br>
> > be done. anyone willing to help, please let me know: it's<br>
> > discouraging sometimes to keep plodding away by myself.<br>
> ><br>
> ><br>
> ><br>
> ><br>
> ><br>
> > On Fri, 2010-11-26 at 18:02 -0800, Kelly wrote:<br>
> > > Definitely consult Jim. I think we may have 240...<br>
> ><br>
> > _______________________________________________<br>
> > Darkroom mailing list<br>
> > Darkroom@lists.noisebridge.net...<br>
> ><br>
><br>
<br>
</div></div></blockquote></div><br>