Repost from a list-approved address...<br>-------<br>My weekday availability is best on Wednesday and Fridays.<br>Those are my work from home days.<br><br><div class="gmail_quote"><br><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">
<div><div class="h5"><div class="gmail_quote">On Sat, Aug 8, 2009 at 7:03 PM, Rachel McConnell <span dir="ltr"><<a href="mailto:rachel@xtreme.com" target="_blank">rachel@xtreme.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">Jim, Ted and Mike cc'd above mentioned they'd like to help out with electrical work.  I dunno how many people will be needed for this work but we have four ready to go now.<br>


<br>
I had a couple additional thoughts on electrical tasks after you left last night. Here's the full list as I see it, please add anything I left off.<br>
<br>
- fix front breaker cabinet<br>
- get front meter turned on<br>
- get electricity into NB name<br>
- verify overhead tracks<br>
- evaluate circuits (coordinate with walls team, kitchen team, hvac team about their needs)<br>
- move and/or add outlets if needed<br>
- raise existing fixtures above level of new walls<br>
- change and add light switches (current switch situation is really weird)<br>
<br>
I'll volunteer to call PG&E on Monday and deal with the meters.<br>
<br>
I can be around for a lunch meeting sometime this week, Jim, although I know Mike works down the peninsula. When would be good for you?<br><font color="#888888">
<br>
-Rachel<br>
</font></blockquote></div><br>
</div></div></blockquote><br></div><br>