[Build] Landlord

Rachel McConnell rachel at xtreme.com
Fri Aug 14 19:46:54 UTC 2009


Can you be more specific with the plan?  I'm happy to present it to
Henry but I have to understand it first.  Details I need:

* which door(s)
* what changes we want to make
* how this will affect the 2nd floor tenants
* what we need the landlord to do, if anything
* why they should let us do it (hopefully this is something like, "it'll
be a lot more secure and you don't have to do any of the work")

We have to sell it to them, see.

Rachel

Dr. Jesus wrote:
> On Thu, Aug 13, 2009 at 1:40 PM, Rachel McConnell<rachel at xtreme.com> wrote:
>> What list of issues?  Do you mean the list Rubin sent out recently?  The
>> only things there that I'd want to see the landlord contacted about is
>> the elevator; I strongly feel that for the downstairs door locks we
>> should come up with a plan first.  Or is there some other list somewhere?
> 
> Yes, that list.  Rubin knows what the plan is: prox readers and keyed
> override for authentication, and a dropbolt or maglock for the door.
> 
>> Andy has been doing a lot of the liaison with Henry.  I've done some too
>> and we seem to get along; I don't mind taking over this role, Andy, if
>> you want.
> 
> Either way I'd like to be able to have a date to firm up my schedule
> for later tonight.
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build



More information about the Build mailing list