[Build] electrical demo

jim jim at well.com
Sun Aug 16 22:53:57 UTC 2009


don't worry too much about what to do: 
do something, anything, and we'll make 
progress. you do have the overall list, 
yes? 



On Sun, 2009-08-16 at 12:44 -0700, Rachel McConnell wrote:
> I'm planning on showing up there ... probably about 3, which is about
> when Lamont said he'd be there too IIRC.
> 
> If you want to get in earlier, though, there were a bunch of keys at 83C
> in the membership cabinet in an Altoids tin.  There may be some left
> there still.  Feel free to take a set, you're doing build work and
> that's what those are for.
> 
> Jim may have a better idea, but my guess is the next highest electrical
> demo priority is the wiremold along the back wall and south wall, the
> stuff that's partly built into the floor... that's what I was planning
> on working on anyway.  Also, tracing wires from all the breaker boxes,
> but that's a job much more easily done with 2 people.
> 
> Rachel
> 
> deleTed wrote:
> > I thought I might come by 2169 in a bit and do some electrical demo.
> > I will be toting screwdrivers, a knife, and a drill w/ screw bits.
> > Is anyone around who can let me in?
> > 
> > Also, Lamont & Rachael: what are the highest priority demolition targets
> > at the moment?
> > 
> > dlt.
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
> 




More information about the Build mailing list