[Build] electrical demo

jim jim at well.com
Mon Aug 17 16:08:06 UTC 2009


("whew!") 
   seems to me the breaker box is usable. the top 
two positions seem good and the bottom position 
doesn't seem too bad, and my guess is that the 
position third from the top (second from the 
bottom) was being used despite its groady 
condition. 
   the problem with replacing the box is finding 
one that is the same size and has the same holes 
so we can match it to the many pipes connecting 
to the existing box. 
   it may be possible to replace the bus bars 
themselves rather than the entire box. 




On Sun, 2009-08-16 at 22:21 -0700, deleTed wrote:
> Oh, and by "taking apart" I mean that I removed the breakers.  The box
> itself is still intact.
> 
> On Sun, Aug 16, 2009 at 10:20 PM, deleTed <arbzed at gmail.com> wrote:
>         I ended up taking the 3-phase breaker box apart.
>         
>         Some of the breakers had arced and melted/deformed the
>         connectors to the box behind them.  I showed this to Neil, and
>         his opinion was that we should replace the breaker box (one or
>         two of the tabs that attach to the breakers are melted enough
>         to be useless).  The breakers I removed (the ones that didn't
>         have melted connectors) are in a box in the electrical storage
>         closet.
>         
>         Any wires that were wired to be switched together by the
>         breakers, in case that information might come in handy for
>         some reason.  
>         
>         
>         
>         On Sun, Aug 16, 2009 at 3:53 PM, jim <jim at well.com> wrote:
>                 
>                 don't worry too much about what to do:
>                 do something, anything, and we'll make
>                 progress. you do have the overall list,
>                 yes?
>                 
>                 
>                 
>                 
>                 On Sun, 2009-08-16 at 12:44 -0700, Rachel McConnell
>                 wrote:
>                 > I'm planning on showing up there ... probably about
>                 3, which is about
>                 > when Lamont said he'd be there too IIRC.
>                 >
>                 > If you want to get in earlier, though, there were a
>                 bunch of keys at 83C
>                 > in the membership cabinet in an Altoids tin.  There
>                 may be some left
>                 > there still.  Feel free to take a set, you're doing
>                 build work and
>                 > that's what those are for.
>                 >
>                 > Jim may have a better idea, but my guess is the next
>                 highest electrical
>                 > demo priority is the wiremold along the back wall
>                 and south wall, the
>                 > stuff that's partly built into the floor... that's
>                 what I was planning
>                 > on working on anyway.  Also, tracing wires from all
>                 the breaker boxes,
>                 > but that's a job much more easily done with 2
>                 people.
>                 >
>                 > Rachel
>                 >
>                 > deleTed wrote:
>                 > > I thought I might come by 2169 in a bit and do
>                 some electrical demo.
>                 > > I will be toting screwdrivers, a knife, and a
>                 drill w/ screw bits.
>                 > > Is anyone around who can let me in?
>                 > >
>                 > > Also, Lamont & Rachael: what are the highest
>                 priority demolition targets
>                 > > at the moment?
>                 > >
>                 > > dlt.
>                 
>                 > _______________________________________________
>                 > Build mailing list
>                 > Build at lists.noisebridge.net
>                 > https://www.noisebridge.net/mailman/listinfo/build
>                 >
>                 
>         
>         
> 




More information about the Build mailing list