[Build] building stuff?

jim jim at well.com
Wed Jan 13 06:27:49 UTC 2010


   as to electrical, i've accepted very slow 
progress. every time i go to NB i do something, 
but not much. still there's progress. 
   new pipe goes from the southwest sub-panel 
along the south wall and up to the ceiling. 
   next step will connect to a ceiling box 
that's connected to a run of empty pipe that 
goes to the storage room. 
   one way or another i'll join new pipe to 
that existing run and connect to the darkroom. 
   step after that is to pull wires to power 
the storage room, darkroom, and points east 
along the south wall then close up boxes in 
the darkroom and install receptacles in the 
storage room that include a utility circuit 
as well as a dedicated circuit for the rack. 
   there'll be more pipe and boxes to install 
on the south wall for the electronics area. 
   i expect other people to screw screws that 
fasten the boxes and pipes to the walls. i 
hope some people will wire up receptacles after 
the screws are screwed. 
   left to my own direction, the next job will 
be pipes and boxes in the turing classroom. 

   as to the library shelving, i'm in despair. 
several people have offered to help and then 
disappeared. i really want to get the books 
available. 
   the storage room shelving is not finished, 
though there are two or three shelves cut to 
fit, waiting to be installed. same story as 
the library shelving--offers to help with no 
follow-through. 
   it would be great to get some commitment 
from more persons than just me to put a little 
time into these two carpentry projects. 



On Tue, 2010-01-12 at 20:43 -0800, Andy Isaacson wrote:
> What's the status of the build?  Do we need worker bees?  Will there be
> work days anytime this weekend (or during the week)?
> 
> -andy
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
> 




More information about the Build mailing list