[Build] building stuff?
jim
jim at well.com
Wed Jan 13 06:27:49 UTC 2010
as to electrical, i've accepted very slow
progress. every time i go to NB i do something,
but not much. still there's progress.
new pipe goes from the southwest sub-panel
along the south wall and up to the ceiling.
next step will connect to a ceiling box
that's connected to a run of empty pipe that
goes to the storage room.
one way or another i'll join new pipe to
that existing run and connect to the darkroom.
step after that is to pull wires to power
the storage room, darkroom, and points east
along the south wall then close up boxes in
the darkroom and install receptacles in the
storage room that include a utility circuit
as well as a dedicated circuit for the rack.
there'll be more pipe and boxes to install
on the south wall for the electronics area.
i expect other people to screw screws that
fasten the boxes and pipes to the walls. i
hope some people will wire up receptacles after
the screws are screwed.
left to my own direction, the next job will
be pipes and boxes in the turing classroom.
as to the library shelving, i'm in despair.
several people have offered to help and then
disappeared. i really want to get the books
available.
the storage room shelving is not finished,
though there are two or three shelves cut to
fit, waiting to be installed. same story as
the library shelving--offers to help with no
follow-through.
it would be great to get some commitment
from more persons than just me to put a little
time into these two carpentry projects.
On Tue, 2010-01-12 at 20:43 -0800, Andy Isaacson wrote:
> What's the status of the build? Do we need worker bees? Will there be
> work days anytime this weekend (or during the week)?
>
> -andy
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
>
More information about the Build
mailing list