[Build] Build Digest, Vol 10, Issue 10
jim
jim at well.com
Thu Jul 22 19:53:40 UTC 2010
the guiding light seems to be a torch that's passed.
frantisek seems the current holder. i believe frantisek
will be around the space today (thursday) and has some
plans to do something this weekend, too.
i'm interested in the build-out things, too.
i've mainly done electrical work and helped some
with floors and sheetrock and painting.
seems to me the most important consideration is to
get and keep several people involved--appeal regularly
to get those who want to help as well as those who want
to learn something of the trades.
as i understand the state of things, finishing the
raw plumbing is the first thing to do:
this means undoing a few connections in the water
supply (copper pipe) and replacing fittings with those
that let us extend water supply to the shower, washing
machine location, and the darkroom, and possibly one
or two other things.
it also means finishing the drains and vents, don't
forget the drain from the darkroom, which has to join
the drain from the shower pan, and make sure the vent
run near the washer-drier location is completed
(probably run above to the main stack, which means
cut out a portion of the stack and replace it with a
hub that's got a two-inch input).
scott and zedd can confirm and correct my
description.
NOTE: the area above this set of rooms, i believe,
is meant for storage. i would remove the old plaster
up there where necessary and fir out areas where lathe
is missing, then rock over plaster where it's been
left intact and lathe where plaster's removed.
(properly, seems to me, we should remove all plaster
and all lathe and put rock up on the bare studs, but
i wouldn't bother up there.)
I would add some spacers between the joists above
the ceiling and then put plywood on top of the
joists and shellac the plywood (shellac is a reasonably
good finish, dries real fast, can be painted later...).
there are a few things that can be done before the
raw plumbing is completed, though not many:
remove any remaining old plaster, make a decision
about removing lathe before putting on sheetrock.
put sheetrock up over areas where raw plumbing is
completed or not to be installed.
after raw plumbing is done (copper is stubbed out
where needed, drain and vent pipes are in place), then
finish putting up the sheetrock and tape and mud.
NOTE: there's a plan to put a short wall up to
protect the water heater from the shower.
NOTE: where electricity is in the walls, let it be.
for any other electrical needs, plan them to be on the
surface, not in the walls (it's a hacker space, not a
rental apartment for mom and dad; pipes on the surface
are much more easily extended or modified or repaired).
please use black wires for receptacles and red wires
for lights and appliances (and don't connect a black
wire between a receptacle and a red supply wire or
conversely--colors should be consistent from device
to sub-panel).
it may be smart to prime and paint the rock at this
point--i'd use pva primer and alkyd enamel (oil enamel
resists water much better than water-based enamel).
after sheet rock is up (and painted):
extend any needed electrical runs, including pipes,
boxes, wires, devices...,
put in floor tiles and shower pan.
after floor tiles are in, install sinks and faucets
(don't forget the darkroom sink and faucets), toilet,
shower stall, washer and drier...
also install doors and any cabinets and shelves.
install any trim (door casings...).
finish up any painting.
On Thu, 2010-07-22 at 20:19 +0100, Max Rosenblum wrote:
> Hey All,
>
>
> I'm new to the space but have experience drywalling, tiling and
> plumbing...And boatbuilding? I'd be pleased to dive in and help
> finish up the bathroom in any way you think useful. I'm traveling
> back to S.F. right now and have some time next week. Is there a
> regular build meeting or is the listserv it?
>
>
> Best,
>
>
> Max
>
> On Thu, Jul 22, 2010 at 8:00 PM, <build-request at lists.noisebridge.net>
> wrote:
> Send Build mailing list submissions to
> build at lists.noisebridge.net
>
> To subscribe or unsubscribe via the World Wide Web, visit
> https://www.noisebridge.net/mailman/listinfo/build
> or, via email, send a message with subject or body 'help' to
> build-request at lists.noisebridge.net
>
> You can reach the person managing the list at
> build-owner at lists.noisebridge.net
>
> When replying, please edit your Subject line so it is more
> specific
> than "Re: Contents of Build digest..."
>
>
> Today's Topics:
>
> 1. the back build up/bathroom project - reopening Thursday 5
> pm
> and Sunday 1 pm (algoldor at frantisekapfelbeck.org)
>
>
> ----------------------------------------------------------------------
>
> Message: 1
> Date: Thu, 22 Jul 2010 01:58:03 -0500
> From: algoldor at frantisekapfelbeck.org
> Subject: [Build] the back build up/bathroom project -
> reopening
> Thursday 5 pm and Sunday 1 pm
> To: build at lists.noisebridge.net
> Message-ID:
> <20100722015803.jc763o5pkocw0go4 at web19.justhost.com>
> Content-Type: text/plain; charset=ISO-8859-1;
> DelSp="Yes";
> format="flowed"
>
> HI to All!
> The Bathroom project.
> Scott has made it today, checking the situation. He may be
> able to
> come tomorrow (Thursday) around 5 pm and it would be great if
> someone
> could be with him and help him! I'm out and Raquel is busy
> too,
> unfortunately.
>
> However the big day is going to be Sunday. We will have lunch
> at 1 pm
> and after that we will start to rock and roll working under
> Scott
> supervision. I'll take care about drinks and food in advance
> so we are
> not hungry and dry!
>
> I hope to see as many of you as possible, there is a plenty of
> work
> which can be done in the Church classroom and in the Tea room
> too, so
> do not worry that your abilities and time will be wasted!
> Please let
> me know by email if you can make it.
>
> See you all soon,
>
> Sincerely,
>
> Frantisek
>
>
>
> ------------------------------
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
>
>
> End of Build Digest, Vol 10, Issue 10
> *************************************
>
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
More information about the Build
mailing list