[Build] Sunday Workday
Ben Kochie
ben at nerp.net
Sat Jul 24 18:28:04 UTC 2010
+1
-ben
"UNIX is user-friendly, it's just picky about its friends."
On Fri, 23 Jul 2010, Max Rosenblum wrote:
> I'll be there!
> M
>
> On Fri, Jul 23, 2010 at 12:00 PM, <build-request at lists.noisebridge.net> wrote:
> Send Build mailing list submissions to
> build at lists.noisebridge.net
>
> To subscribe or unsubscribe via the World Wide Web, visit
> https://www.noisebridge.net/mailman/listinfo/build
> or, via email, send a message with subject or body 'help' to
> build-request at lists.noisebridge.net
>
> You can reach the person managing the list at
> build-owner at lists.noisebridge.net
>
> When replying, please edit your Subject line so it is more specific
> than "Re: Contents of Build digest..."
>
>
> Today's Topics:
>
> 1. Re: Build Digest, Vol 10, Issue 10 (Max Rosenblum)
> 2. Re: Build Digest, Vol 10, Issue 10 (jim)
>
>
> ----------------------------------------------------------------------
>
> Message: 1
> Date: Thu, 22 Jul 2010 20:19:40 +0100
> From: Max Rosenblum <capnmax at gmail.com>
> Subject: Re: [Build] Build Digest, Vol 10, Issue 10
> To: build at lists.noisebridge.net
> Message-ID:
> <AANLkTimcz0wUhfUK_FXN5XmRsRtHBF-d3a5KEuStNQIB at mail.gmail.com>
> Content-Type: text/plain; charset="iso-8859-1"
>
> Hey All,
>
> I'm new to the space but have experience drywalling, tiling and
> plumbing...And boatbuilding? I'd be pleased to dive in and help finish up
> the bathroom in any way you think useful. I'm traveling back to S.F. right
> now and have some time next week. Is there a regular build meeting or is
> the listserv it?
>
> Best,
>
> Max
>
> On Thu, Jul 22, 2010 at 8:00 PM, <build-request at lists.noisebridge.net>wrote:
>
> > Send Build mailing list submissions to
> > build at lists.noisebridge.net
> >
> > To subscribe or unsubscribe via the World Wide Web, visit
> > https://www.noisebridge.net/mailman/listinfo/build
> > or, via email, send a message with subject or body 'help' to
> > build-request at lists.noisebridge.net
> >
> > You can reach the person managing the list at
> > build-owner at lists.noisebridge.net
> >
> > When replying, please edit your Subject line so it is more specific
> > than "Re: Contents of Build digest..."
> >
> >
> > Today's Topics:
> >
> > 1. the back build up/bathroom project - reopening Thursday 5 pm
> > and Sunday 1 pm (algoldor at frantisekapfelbeck.org)
> >
> >
> > ----------------------------------------------------------------------
> >
> > Message: 1
> > Date: Thu, 22 Jul 2010 01:58:03 -0500
> > From: algoldor at frantisekapfelbeck.org
> > Subject: [Build] the back build up/bathroom project - reopening
> > Thursday 5 pm and Sunday 1 pm
> > To: build at lists.noisebridge.net
> > Message-ID: <20100722015803.jc763o5pkocw0go4 at web19.justhost.com>
> > Content-Type: text/plain; charset=ISO-8859-1; DelSp="Yes";
> > format="flowed"
> >
> > HI to All!
> > The Bathroom project.
> > Scott has made it today, checking the situation. He may be able to
> > come tomorrow (Thursday) around 5 pm and it would be great if someone
> > could be with him and help him! I'm out and Raquel is busy too,
> > unfortunately.
> >
> > However the big day is going to be Sunday. We will have lunch at 1 pm
> > and after that we will start to rock and roll working under Scott
> > supervision. I'll take care about drinks and food in advance so we are
> > not hungry and dry!
> >
> > I hope to see as many of you as possible, there is a plenty of work
> > which can be done in the Church classroom and in the Tea room too, so
> > do not worry that your abilities and time will be wasted! Please let
> > me know by email if you can make it.
> >
> > See you all soon,
> >
> > Sincerely,
> >
> > Frantisek
> >
> >
> >
> > ------------------------------
> >
> > _______________________________________________
> > Build mailing list
> > Build at lists.noisebridge.net
> > https://www.noisebridge.net/mailman/listinfo/build
> >
> >
> > End of Build Digest, Vol 10, Issue 10
> > *************************************
> >
> -------------- next part --------------
> An HTML attachment was scrubbed...
> URL:
> http://www.noisebridge.net/pipermail/build/attachments/20100722/10a2744b/attachment-0001.htm
>
> ------------------------------
>
> Message: 2
> Date: Thu, 22 Jul 2010 12:53:40 -0700
> From: jim <jim at well.com>
> Subject: Re: [Build] Build Digest, Vol 10, Issue 10
> To: Max Rosenblum <capnmax at gmail.com>
> Cc: build at lists.noisebridge.net
> Message-ID: <1279828420.1666.44.camel at jim-laptop>
> Content-Type: text/plain; charset="UTF-8"
>
>
> the guiding light seems to be a torch that's passed.
> frantisek seems the current holder. i believe frantisek
> will be around the space today (thursday) and has some
> plans to do something this weekend, too.
> i'm interested in the build-out things, too.
> i've mainly done electrical work and helped some
> with floors and sheetrock and painting.
>
> seems to me the most important consideration is to
> get and keep several people involved--appeal regularly
> to get those who want to help as well as those who want
> to learn something of the trades.
>
> as i understand the state of things, finishing the
> raw plumbing is the first thing to do:
> this means undoing a few connections in the water
> supply (copper pipe) and replacing fittings with those
> that let us extend water supply to the shower, washing
> machine location, and the darkroom, and possibly one
> or two other things.
> it also means finishing the drains and vents, don't
> forget the drain from the darkroom, which has to join
> the drain from the shower pan, and make sure the vent
> run near the washer-drier location is completed
> (probably run above to the main stack, which means
> cut out a portion of the stack and replace it with a
> hub that's got a two-inch input).
> scott and zedd can confirm and correct my
> description.
>
> NOTE: the area above this set of rooms, i believe,
> is meant for storage. i would remove the old plaster
> up there where necessary and fir out areas where lathe
> is missing, then rock over plaster where it's been
> left intact and lathe where plaster's removed.
> (properly, seems to me, we should remove all plaster
> and all lathe and put rock up on the bare studs, but
> i wouldn't bother up there.)
> I would add some spacers between the joists above
> the ceiling and then put plywood on top of the
> joists and shellac the plywood (shellac is a reasonably
> good finish, dries real fast, can be painted later...).
>
> there are a few things that can be done before the
> raw plumbing is completed, though not many:
> remove any remaining old plaster, make a decision
> about removing lathe before putting on sheetrock.
> put sheetrock up over areas where raw plumbing is
> completed or not to be installed.
>
> after raw plumbing is done (copper is stubbed out
> where needed, drain and vent pipes are in place), then
> finish putting up the sheetrock and tape and mud.
> NOTE: there's a plan to put a short wall up to
> protect the water heater from the shower.
> NOTE: where electricity is in the walls, let it be.
> for any other electrical needs, plan them to be on the
> surface, not in the walls (it's a hacker space, not a
> rental apartment for mom and dad; pipes on the surface
> are much more easily extended or modified or repaired).
> please use black wires for receptacles and red wires
> for lights and appliances (and don't connect a black
> wire between a receptacle and a red supply wire or
> conversely--colors should be consistent from device
> to sub-panel).
> it may be smart to prime and paint the rock at this
> point--i'd use pva primer and alkyd enamel (oil enamel
> resists water much better than water-based enamel).
>
> after sheet rock is up (and painted):
> extend any needed electrical runs, including pipes,
> boxes, wires, devices...,
> put in floor tiles and shower pan.
>
> after floor tiles are in, install sinks and faucets
> (don't forget the darkroom sink and faucets), toilet,
> shower stall, washer and drier...
> also install doors and any cabinets and shelves.
> install any trim (door casings...).
>
> finish up any painting.
>
>
>
> On Thu, 2010-07-22 at 20:19 +0100, Max Rosenblum wrote:
> > Hey All,
> >
> >
> > I'm new to the space but have experience drywalling, tiling and
> > plumbing...And boatbuilding? I'd be pleased to dive in and help
> > finish up the bathroom in any way you think useful. I'm traveling
> > back to S.F. right now and have some time next week. Is there a
> > regular build meeting or is the listserv it?
> >
> >
> > Best,
> >
> >
> > Max
> >
> > On Thu, Jul 22, 2010 at 8:00 PM, <build-request at lists.noisebridge.net>
> > wrote:
> > Send Build mailing list submissions to
> > build at lists.noisebridge.net
> >
> > To subscribe or unsubscribe via the World Wide Web, visit
> > https://www.noisebridge.net/mailman/listinfo/build
> > or, via email, send a message with subject or body 'help' to
> > build-request at lists.noisebridge.net
> >
> > You can reach the person managing the list at
> > build-owner at lists.noisebridge.net
> >
> > When replying, please edit your Subject line so it is more
> > specific
> > than "Re: Contents of Build digest..."
> >
> >
> > Today's Topics:
> >
> > 1. the back build up/bathroom project - reopening Thursday 5
> > pm
> > and Sunday 1 pm (algoldor at frantisekapfelbeck.org)
> >
> >
> > ----------------------------------------------------------------------
> >
> > Message: 1
> > Date: Thu, 22 Jul 2010 01:58:03 -0500
> > From: algoldor at frantisekapfelbeck.org
> > Subject: [Build] the back build up/bathroom project -
> > reopening
> > Thursday 5 pm and Sunday 1 pm
> > To: build at lists.noisebridge.net
> > Message-ID:
> > <20100722015803.jc763o5pkocw0go4 at web19.justhost.com>
> > Content-Type: text/plain; charset=ISO-8859-1;
> > DelSp="Yes";
> > format="flowed"
> >
> > HI to All!
> > The Bathroom project.
> > Scott has made it today, checking the situation. He may be
> > able to
> > come tomorrow (Thursday) around 5 pm and it would be great if
> > someone
> > could be with him and help him! I'm out and Raquel is busy
> > too,
> > unfortunately.
> >
> > However the big day is going to be Sunday. We will have lunch
> > at 1 pm
> > and after that we will start to rock and roll working under
> > Scott
> > supervision. I'll take care about drinks and food in advance
> > so we are
> > not hungry and dry!
> >
> > I hope to see as many of you as possible, there is a plenty of
> > work
> > which can be done in the Church classroom and in the Tea room
> > too, so
> > do not worry that your abilities and time will be wasted!
> > Please let
> > me know by email if you can make it.
> >
> > See you all soon,
> >
> > Sincerely,
> >
> > Frantisek
> >
> >
> >
> > ------------------------------
> >
> > _______________________________________________
> > Build mailing list
> > Build at lists.noisebridge.net
> > https://www.noisebridge.net/mailman/listinfo/build
> >
> >
> > End of Build Digest, Vol 10, Issue 10
> > *************************************
> >
> >
> > _______________________________________________
> > Build mailing list
> > Build at lists.noisebridge.net
> > https://www.noisebridge.net/mailman/listinfo/build
>
>
>
>
> ------------------------------
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
>
>
> End of Build Digest, Vol 10, Issue 11
> *************************************
>
>
>
>