Thank You!!!!!!!!!!!one!!!!!!!!!!!!eleventyone11111!!!!!!!!!!!Did you finish
the conduit I started earlier today, or did you run a new one?

Zedd

On Sun, Mar 7, 2010 at 1:19 AM, Ian Atha <thatha at thatha.org> wrote:

> Conduit installed. Currently not bound to water heater to make pulling wire
> easier.
>
> Didn't manage to pull the wire, but fishtape and wires are there, waiting
> for someone who can wrap wires around fish tape and pull/push.
>
> Conduit also needs to be bound to ceiling.
>
> I just remembered that I forgot to turn on the kitchen circuitbreakers
> before leaving and I am too beat to go back.
>
> On Mar 2, 2010 1:45 PM, "Zedd Epstein" <zedd.00 at gmail.com> wrote:
>
> Copper is all in. We need a red and a black 8 or 10 guage wire ran to it,
> then we have hot water. Power and a switch need to be run to the garbage
> disposal. We also need power ran to the microwave cabinet above the
> dishwasher, then down to the dishwasher.
>
> I should be there around 4 to try and help with what I can, and pressurize
> the hot water to make sure it doesn't leak.
>
> Zedd
>
> _______________________________________________
> Noisebridge-discuss mailing list
> Noisebridge-discuss at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/noisebridge-discuss
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.noisebridge.net/pipermail/build/attachments/20100307/4b2853fe/attachment.html>


More information about the Build mailing list