[Build] Wall building
miloh
froggytoad at gmail.com
Sun Nov 27 18:18:49 UTC 2011
Jim, are there already lighting circuits connected in the 6' wall boxes the
Turing CAVE? Sorry if I'm not up to speed with this -- it will be easy to
fix up lights for Turing if so! There's a light switch on light flex
sitting on a table in there already...
Anyone working on electical: please follow the conventions jim set up so
everyone is on the same page --->
receptacles on black circuits
lights/fans on red circuits
I couldn't find the original references to this but there's the RFC re: the
bathroom buildout
Noisebridge electrical RFC
https://www.noisebridge.net/pipermail/build/2010-August/000770.html
and reference information on panel location and wiring info:
https://www.noisebridge.net/pipermail/build/2010-August/000772.html
-rma
(henceforth referring to the noisebridge rooms as CAVEs)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.noisebridge.net/pipermail/build/attachments/20111127/d8ac7bac/attachment.html>
More information about the Build
mailing list