[Build] Sprucing up the classrooms

Torrie Fischer tdfischer at hackerbots.net
Tue Aug 19 19:29:19 UTC 2014


On Tuesday, August 19, 2014 10:17:17 AM Rubin Abdi wrote:
> daravinne wrote on 2014-08-19 10:11:
> > if you're talking about the projector in the main room that was hanging
> > from the ceiling originally, that one was gutted by tweakers and no longer
> > exists. it needs to be replaced outright.  for last 5mof teratoma lent me
> > a
> > shitty projector that we slapped on top of a pole.
> 
> Ah that's good to know.
> 
> Again for now could I ask whoever is leading/doing electrical, please
> install wall outlets where a projector could in theory go...
> 
> * Hackatorium - On the ceiling where the old projector was
> * Turing - On the South wall up high dead center http://is.gd/73tKWI
> * Church - Next to the current projector mount on the ceiling

There is one going into Church already. There's a conduit box already mounted 
and should be finished soon.

I think Neil is subscribed to build@ but I'm not sure if any mails are 
actually processed. Someone with more free time than me should mail him 
directly and get something set up:

neil maclean <neil at warmcove.org>

> 
> We can revisit the whole what projector to get discuss in a month after
> all the dust has settled and I'm no longer in agonizing crotch pain.




More information about the Build mailing list