[Build] Reboot progress for 12/7/14

Torrie Fischer tdfischer at hackerbots.net
Sun Jul 13 03:55:53 UTC 2014


Hi, build at .

Today we made some significant progress on the space.

Here's some pictures taken around 5p after most of us were reasonably 
exhausted:

http://imgur.com/a/kboen

Things that were done:

* Bits of conduit on the floor in Turing was cleaned up to be used as storage
* Big gaping square holes in Turing and just outside the shop were patched
* 3d Printer area packed up and moved to Turing for storage
* Lots of the kitchen appliances and tools packed into boxes and stored along 
the wall
* A mountain of chairs was assembled from those left in the front quarter
* Darkroom got some cleanup and is now more empty
* EE lab tidily put into bins and ready for moving
* A few tables from up front were cleaned up and moved to the back kitchen 
where things were immediately put on top of them again
* More drywall joints in the shop were plastered and finished. They'll be 
ready for sanding tomorrow

Things that need done still:

* There's more tables and furniture and such up front to be moved
* Sweeping!
* We're waiting on the electricians to do their magic along the north wall, so 
please keep floor space in that area clear
* A system to seal off portions of the space while floor sanding and 
refinishing happens needs developed
* Extending the kitchen wall to the ceiling
* Replacing the ceiling drywall in the room behind the kitchen
* Hanging drywall in that same room
* Patching holes in the ceiling
* Lots more, if you've got something to add

The fight to undo Noisebridge's entropy marches onward! Everyone involved is 
doing very excellent work :)
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 198 bytes
Desc: This is a digitally signed message part.
URL: <http://www.noisebridge.net/pipermail/build/attachments/20140712/abbbbdf5/attachment-0002.sig>


More information about the Build mailing list