[Build] Flooring work

Torrie Fischer tdfischer at hackerbots.net
Mon Jul 14 20:58:08 UTC 2014


Hi, build at .

This week we'd like to start the process of sanding and refinishing vast 
swaths of the floor.

What is needed:

* Two floor sander pilots
* One floor edger pilot
* Folks to apply denatured alcohol on the sanded surfaces for cleaning
* Folks to apply polyurethane over the cleaned surfaces

Equipment rentals and supplies are being worked out in the meantime.

Idealy this can start on Thursday at 6pm. Is that an issue for anyone? I'll be 
there a bit before 6p to get things ready.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 198 bytes
Desc: This is a digitally signed message part.
URL: <http://www.noisebridge.net/pipermail/build/attachments/20140714/ef1c931d/attachment-0002.sig>


More information about the Build mailing list