[Build] The great AV revamp thread

Rubin Abdi rubin at starset.net
Fri Oct 31 06:17:26 UTC 2014


Things that have happened:
* Rayc did a bang up job at mounting the screen
* Torrie, Patrick and I mounted the first projector in the Hackatorium.
It might need a tiny bit more adjustment to be centered. There are
currently no cables run to this projector, nor power.

Things that have started:
* Jarrod is figuring how best to mount the anchor and mount the mixer,
the DVR lock box, and the microphone lock box to the column in the
Hackatorium.
* Rayc is starting to mount the speakers for inside each of the classrooms.

Things that could happen between now and Saturday:
* Bridal hooks in the ceiling going behind the projector screen.
* the cable going from the screen to the controller box getting cut and
extended so the box can reach the column at about chest height wile
being fished through the bridal hooks.

I think I wont be coming in tomorrow night, so I'll be in on Saturday.
I'm going to try to get in on the earlier side to start work on things,
so maybe 11ish. I'll be out by 5 or 6 in the eve.

Thanks!

-- 
Rubin
rubin at starset.net

-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 473 bytes
Desc: OpenPGP digital signature
URL: <http://lists.noisebridge.net/pipermail/build/attachments/20141030/79650037/attachment-0003.sig>


More information about the Build mailing list