Spoke with Jim last night. He's offered to grab what electrical we need 
(standard bulb fixtures, light switches, one switch with a cover, etc).

Things that need to be completed before he can work on Wednesday...

* All of the conduit boxes need to be opened and inspected, including 
along the South wall past the dark room heading towards the new bathroom.
* All old cables need to be pulled.
* Space along the inside permiter of the room needs to be cleared out so 
Jim can get in there.

Thing that Jim will want help on (as in work he isn't willing to do) 
during Wednesday...

* Fishing and pulling fresh cable through all the new pipes.
* Screwing panels back on.
* Screwing light figures on.

Is anyone available today or Wednesday (most likely before noon) to help 
out with this work?

-- 