[Noisebridge-discuss] final move-out todo at 83c
jim
jim at well.com
Sun Sep 27 15:57:53 UTC 2009
how to coordinate? i like company.
On Sat, 2009-09-26 at 18:34 -0700, Andy Isaacson wrote:
> 1. reinstall sconces. There are two; one is at 83c in the cupboard
> above the fridge, the other is somewhere at 2169. They'll need some
> small wire nuts and someone who knows how to not kill themselves with
> 120vac.
JS: i can help with this
>
> 2. reinstall closet door hinges upstairs.
JS: i can help with this
>
> 3. remove some drywall anchors (the blue plastic ones) and patch holes
> with spackle / putty, then paint.
JS: i can help with this
>
> 4. paint the EMT.
JS: i can help with this (tho' i don't want to, it's
grody work...)
>
> 5. patch drywall hole above the breaker box (in the darkroom). It's
> about 6"x4" at maximum.
JS: i can help with this
>
> 6. clean the walls, then paint the bikeshed.
JS: i can help with this
>
> 8. bring the air compressor and good shop-vac over and blow the gunk out
> of the baseboard wiring.
JS: i can help with this
>
> 9. rent a carpet cleaner and do a pass through the upstairs. However
> first decide if the carpet is a lost cause and we should just ask Ahuva
> to replace it.
>
More information about the Noisebridge-discuss
mailing list