hiya,
i'm stuck on a cabling job, still got to crawl
down in a hole and pull cables. after that, just
connect them and things ought to work, then a
shower and a 25 minute drive.
i'll definitely hook up the whip between the
kitchen fluorescents to the 4 square box on the
ceiling (i got a few of the proper connectors).
i may be able to pull the wire and electrify
the thing, too.
it'd be great if someone would
* take down two working fluorescent fixtures from
some place they're not needed.
* at least install some toggle bolts in the
ceiling above the two entrances (on "our" side of
the doorway to the elevators and garbage as well
as above the doorway at the top of the stairs).
* bonus thanks for installing toggle bolts in
the ceiling directly south of the doorway at the
top of the stairs and a few feet south of the
line of the wall between the dirty shop and
classrooms and the walkway from the main space
to the east windows.
probably four toggle bolts for each eight
foot fixture, two at each end of the areas where
the fixtures are to be located.
in case it isn't clear, the idea is to light
the space just inside the entrances as well as
the center of the space. switches and such are
in place, all that's needed is to hang the
light fixtures.