[Rack] Rack migration Nov 22nd/23rd
Patrick O'Doherty
p at trickod.com
Sun Nov 23 05:02:29 UTC 2014
I went ahead and re-patched all of the existing patches we had, as well
as the 4 new runs we have to the AV area.
They're patched but untested. I'll hopefully get to do the latter
tomorrow sometime. I also want to paint the side of the rack and
reconstruct it before Monday.
P
On Sat, Nov 22, 2014 at 03:31:38PM -0800, Rubin Abdi wrote:
> Patrick and I today plumbed up the new rack, "Chibi", with most of the
> old hardware...
>
> * New patch panel
> * Old HP switch
> * Router, bike trailer
> * DSL modem
> * New Pegasus machine
> * Minotaur
> * Power strip
> * UPS
>
> We ran in cabling for Monkeybrains, the DSL, and our two APs. The
> internet plus the wifi is currently working.
>
> We then pulled out all the old cabling from the old patch panel and
> through the hole in the wall. The plan is to trim the cables and plumb
> it into the new patch panel. So for the time being the wired network is
> still down.
>
> --
> Rubin
> rubin at starset.net
>