[Build] Electrical demo and floor update

Zedd Epstein zedd.00 at gmail.com
Sun Aug 16 04:06:54 UTC 2009


If someone could vacuum the eastern half of the floor with the squeegy
attachment ( It gets into the grooves in the floor better) that'd be
awesome. Also, if someone would continue running a razor blade down the
grooves in the floor to knock more of the gross out, it'd help a lot. I've
done the between the columns from the kitchen floor to the 4th set of
pillars, so everything else needs to be done.

Zedd

On Sat, Aug 15, 2009 at 3:14 PM, Lamont Lucas <lamont at cluepon.com> wrote:

>
> I removed almost all of the flex conduit marked for removal and rewired the
> boxes they were connected to.  I was concentrating on the eastern half, and
> have not examined the western side.  There is still more demo to be done.
>
> Zedd and I also continued to work on the floors which will need a lot more
> tlc if we are going to try for a sanding/filling/coating test.
>
> I'm gonna leave soon, but zedd I think will continue to rock it.  I'll be
> back tomorrow at 3 or so as well as all day monday.  I'm planning on
> returning the shop vac at 8am on monday unless someone else plans on using
> it
>
> -- Sent from my Palm Pre
>
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.noisebridge.net/pipermail/build/attachments/20090815/80c77e42/attachment-0003.html>


More information about the Build mailing list