[Build] floor work tomorrow
Rachel McConnell
rachel at xtreme.com
Mon Aug 17 06:24:00 UTC 2009
from Crutcher:
"Dr Jesus & I worked on the floor patch & did the remaining half in 30
min. A saw blade as scour was useful, but needs a handle (maybe duct
tape). This could scale up to 3 or 4 people on the same patch, with one
running the vacuum sometimes. This would probably scale linearly. 3 or
4 people would probably do a patch that size in 40 minutes with the
right tools."
Rachel
Lamont Lucas wrote:
> Today I marked out a large section of floor with green neon rope. That
> rope is there so that you don't walk over the floor I'm working on.
> Rachel and I did multiple passes with cleaner, knife and tedious
> scraping to get that floor clean enough to sand. Please don't walk on
> it and track crap over it.
>
> Tomorrow, starting around 11:30, I'm going to vacuum it again, then drum
> sand it and start filling in the cracks with whatever pacific coast
> flooring recommends. My plan is to have at least one coat of sealant on
> it before the general meeting on tuesday so there's something visible to
> consider and examine.
>
> If you would like to help, I believe the crack-filling and cleaning is a
> task easy to parallelize, and many hands make for light work.
>
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
More information about the Build
mailing list