[Build] painting! (general)

Lamont Lucas lamont at cluepon.com
Thu Aug 27 18:27:25 UTC 2009


Rachel McConnell wrote:
> OK we have a plan, it is detailed at
> https://www.noisebridge.net/wiki/Moving/2169_Mission/Painting.  We can
> start with the prep work as soon as the floors are walkable on
> (tonight!), and as long as we don't get in the way of the electrical or
> wall building people.  There's a bunch of prep which is *very* chunky,
> by which I mean that there's useful work that can be done in small time
> allotments, 20 or 30 minutes if that's all you have.

I doubt I'll make it tonight, but I'll head over friday afternoon to do 
some painting prep work.  I'll also bring my powerful-looking tone 
tracer that should be fine on AC cables (I've only used it for data 
cable tracing, but it should be fine)

I went to the space last night to close the windows cause it was raining 
slightly and I didn't want the floors to get wet.  They were looking 
good, and I didn't have to mop up any water when I closed the windows. 

As a side note, looking at the Painting wiki page, I'd like it if we 
didn't get rid of the shrine, just cause I think those things are cool 
and appropriate.  If we decide it has to leave the little nook, I'll 
happily take it home so he can angrily watch over my living room.





More information about the Build mailing list