[Build] electrical status - attn Jim, Neil
Rachel McConnell
rachel at xtreme.com
Sun Sep 13 02:07:41 UTC 2009
Hi guys, it's been suggested to me that it's about time to call PG&E and
get the front power turned on (and the rear power in our name). However
the breaker box in front is still all open with wires sticking out, and
I'd just as soon not show it to a PG&E worker in that state. So I was
wondering,
* are we ready to get the power turned on in front, or should I wait?
* of so, is the breaker box likely to be Done within the next few days,
at least for now, so it doesn't look like we're doing unpermitted
electrical work?
* is this a non-issue since the PG&E person will only have to go to the
basement anyway?
thanks guys! and thanks for all your hard work.
Rachel
More information about the Build
mailing list