[Build] electrical status - attn Jim, Neil

jim jim at well.com
Sun Sep 13 03:57:38 UTC 2009


comments interspersed 

On Sat, 2009-09-12 at 19:07 -0700, Rachel McConnell wrote:
> Hi guys, it's been suggested to me that it's about time to call PG&E and
> get the front power turned on (and the rear power in our name).  However
> the breaker box in front is still all open with wires sticking out, and
> I'd just as soon not show it to a PG&E worker in that state.  So I was
> wondering,
> 
> * are we ready to get the power turned on in front, or should I wait?
JS: as far as i'm concerned, the electrical is about 
as far as it can get before painting, ergo, it's ready 
for painting (we'll have to use extension cords to get 
power to the "front" area). 
> 
> * of so, is the breaker box likely to be Done within the next few days,
> at least for now, so it doesn't look like we're doing unpermitted
> electrical work? 
JS: i plan to connect various
> 
> * is this a non-issue since the PG&E person will only have to go to the
> basement anyway?
> 
> thanks guys! and thanks for all your hard work.
> 
> Rachel
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
> 




More information about the Build mailing list