it's more or less time to energize the "front"
sub-panel.
let me know what day we expect the front panel to <----!!!
be energized and i'll be sure to have connected up
the wires that must be connected so's not to have
fires and/or shocks.
seems to me several big electrical issues remain:
* lights. what to do with these big, cumbersome
light fixtures? probably realign them in groups over
the "dirty workshop" and each of the two classrooms,
at least, and rewire lights so that each group is
controlled by its own switch.
* outlets.
-- determine where the electronic work will really be
and then run a branch or two to that area with
receptacles, to be expanded later.
-- determine where receptacles will be needed in the
"dirty workshop" and each of the two classrooms and
put in a few, to be expanded later.
-- front area. throw up a few receptacles here and
there.
-- toilet areas. take power from the new "kitchen"
sub-panel.
-- photo dark/light-at-the-top room. determine what
receptacles are needed and put in a few or energize
what's there.
-- "kitchen". to be determined.
-- dj booth. to be determined.
-- other locations for receptacles?