[Build] electrical stuff

Zedd Epstein zedd.00 at gmail.com
Sun Jan 24 18:35:44 UTC 2010


I can be there Monday or Tuesday evening to help with this.

Zedd

On Sun, Jan 24, 2010 at 9:13 AM, jim <jim at well.com> wrote:

>
>   ...inch by inch....
>
>   i need some help pulling wires to finish the run
> from the southwest sub-panel to
> * power the darkroom,
> * have a receptacle or two along the south wall
> between the darkroom and the storage room,
> * energize a utility receptacle in the storage room,
> * provide a dedicated circuit for the network rack
> in the storage room,
> * and add a light switch that lets people working in
> the electronics area control the overhead
> fluorescents.
>
>   there are two runs remaining, both fairly long,
> requiring two people: one person "at the box" to
> push wires into the pipe and another person gently
> pulling a fish tape to bring the wires out of the
> target box.
>   a preliminary job that anyone can do alone is to
> dig the wires out of the boxes of wires:
> * one black, one red, one white that are 42 feet
> long or longer;
> * two blacks, one red, two whites that are 52 feet
> long or longer;
> * one red that is 16 feet long or longer.
>
>   after those two runs are done, it's a matter of
> one or two hours to get all that stuff energized.
>
>   i can be at 2169
> * monday a little before 6 PM,
> * tuesday at 6 PM,
> * thursday up to about 5 PM,
> * friday between 10 AM and 1 PM and after 6 PM,
> * saturday before noon.
>
> hopefully,
> jim
>
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.noisebridge.net/pipermail/build/attachments/20100124/fba4ae45/attachment-0001.html>


More information about the Build mailing list