Hi, build@

Neil the electrician came in today and we discussed a better plan of attack 
that would work well with his plans.

He doesn't want to get in the way of the flooring work and we don't really 
want to hamper his electrical efforts, so we're going to handle the space in 
three big chunks.

For reference, the original plan I submitted:

http://i.imgur.com/BzUZVtJ.png

We're going to try and cover the big area labeled #1, while Neil works on 
doing electrical work on the rest of the space. Should take most of saturday 
to get our sanding/cleaning work out of the way on Saturday with application 
of the floor sealant on Saturday night or Sunday.

Once that is done, we'll move things out of areas #3, 8, and 9 (the rooms) 
into the big area for storage and Neil will work on the electrical in the rest 
of the space.

Following that, we'll repeat the pattern with the rest of the space.

We've acquired enough tools and plastic sheeting to make this possible thanks 
to the generous monetary contributions of Michael Schaffer <3

Floor coatings still need to be acquired and will be planned out on Friday.

However, prior to doing any sanding, we need to patch more holes in the now-
accessible walls and do some painting of conduit and walls. Ask piratematt 
about that, but more details should be available soonish. :)

One way or another things will be happening on Saturday be it painting, 
sanding, patching drywall or sealing the floor!
-------------- next part --------------
A non-text attachment was scrubbed...
Name: signature.asc
Type: application/pgp-signature
Size: 198 bytes
Desc: This is a digitally signed message part.
URL: <http://www.noisebridge.net/pipermail/build/attachments/20140717/0f49d6b4/attachment-0002.sig>


More information about the Build mailing list