Last I remember from the electrical plan was that we were going to
decomission use of the 2-Phase panel in the hallway and move everything to
the 3-Phase panel on the elevator room.
Technically, I think this unit can be wired to monitor more than one
panel. It has 32 independent metering channels. I don't know what the
software limitations are.
As for physical installation, the Current Transformers (CTs) come with
1-2 meter long leads depending on the model. Supposedly this can be
extended over twisted pair for a fairly long distance (10s of meters) with
minimal accuracy loss. There was some info I found about this, but it's
lost in my memory.
http://www.mypowerpanel.com/greeneye/
-ben
On Tue, 29 Jul 2014, Patrick O'Doherty wrote:
> We have two meters at the space due to historical reasons, both in use. Would we need one of
> these per meter?
> —
> Sent from Mailbox
>
>
> On Tue, Jul 29, 2014 at 8:34 AM, Ben Kochie <ben at nerp.net> wrote:
>
> Technically I did a long long time ago, we even had a consensus item to
> approve buying it.
>
> If the new NB electricians approve installation of it, I can probably
> donate it. I don't want to order it if they won't install it, or think
> it's a bad option.
>
> Maybe someone who is working with them can arrange a chat.
>
> -ben
>
> On Tue, 29 Jul 2014, Mitch Altman wrote:
>
> > That would be way nice! You wanna donate for it, Ben?
> >
> > Best,
> > Mitch.
> >
> >
> > > Date: Tue, 29 Jul 2014 01:24:41 -0700
> > > From: ben at nerp.net
> > > To: tdfischer at hackerbots.net
> > > CC: build at lists.noisebridge.net
> > > Subject: Re: [Build] Space update for Monday, July 28th
> > >
> > > That looks great. Keep up the photo documentation. I havn't seen the
> > > space that empty since we moved in back in 2009!
> > >
> > > It looks like you removed all the overhead track power, is that going back
> > > in?
> > >
> > > Oh, maybe now we can finally install this with the power panel:
> > >
> > > http://www.brultech.com/home/store/product.php?id_product=114
> > >
> > > -ben
> > >
> > > On Mon, 28 Jul 2014, Torrie Fischer wrote:
> > >
> > > > On Monday, July 28, 2014 11:04:21 Naomi Most wrote:
> > > >> Straight from Space Pirate Matt:
> > > >>
> > > >> """
> > > >> Floors are refinished [in the main Hackatorium area], walls are primed and
> > > >> art is starting to go up on the walls.
> > > >>
> > > >> The electrician will soon have our new LED tube lighting going up and plugs
> > > >> and fixtures complete.
> > > >>
> > > >> Still needing to be done: Paint window frames, wall in second door in
> > > >> elevator area, finish painting conduit.
> > > >> """
> > > >>
> > > >> MATERIAL NEEDS:
> > > >>
> > > >> Paint: red, black, primer (5 gal)
> > > >> Floor: matte polyurethane coat
> > > >>
> > > >> [Torrie, chime in when you can about specifics on polyu)
> > > >
> > > > Something like 20 gallons of polyurethane. Preferably something like a satin
> > > > gloss since it'll get scratched up real quick anyways :)
> > > >
> > > > There was also some discussion earlier today in slack about acquiring a bunch
> > > > of bridle rings for running cat5 in the space. This is what we did at SYNHAK
> a
> > > > while ago, where we installed them in a grid-like fashion so anyone could run
> > > > anything anywhere. 2 inch is best if someone wants to order a big number of
> > > > them and drop them off at the space.
> > > >
> > > > Consensus seems to be that we won't be using the cable trays since arbitrary
> > > > hooks are more cost effective.
> > > >
> > > > Bee tee dubs, here's a picture of the space right before we started loading
> it
> > > > with things:
> > > >
> > > >
> https://lh6.googleusercontent.com/k13XlyVXYk8SxfhHbczBPd1KukTOpKakbl5I0aj21vE=w701-h519-no
> > > >
> > > > Y'all should be super proud of the work we've done! Its beautiful!!
> > > >
> > > >>
> > > >>
> > > >> VOLUNTEER NEEDS for this week:
> > > >>
> > > >> * Painting
> > > >> * Flooring
> > > >> * Sanding
> > > >> * Moving things around
> > > >>
> > > >>
> > > >> If you want to help, please contact Matt (bugsglo at gmail.com) or Torrie (
> > > >> tdfischer at hackerbots.net) to get the specific times when you should come.
> > > >>
> > > >> Also watch for volunteer announcements both on this list and via
> > > >> volunteer-announce at noisebridge.systems
> > > >>
> > > >> Signing off,
> > > >> Naomi
> > > >>
> > > >> (Sppaaaaace! Updaaaate!)
> > > >
> > > > _______________________________________________
> > > > Build mailing list
> > > > Build at lists.noisebridge.net
> > > > https://www.noisebridge.net/mailman/listinfo/build
> > > >
> > > _______________________________________________
> > > Build mailing list
> > > Build at lists.noisebridge.net
> > > https://www.noisebridge.net/mailman/listinfo/build
> >
> >_______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build
>
>
>
>
More information about the Build
mailing list