[Noisebridge-discuss] electrical report sunday 20091004

jim jim at well.com
Sun Oct 4 16:32:14 UTC 2009


(assuming i, jim, don't show up at the tuesday meeting) 

   we expect the "front" sub-panel to be energized before 
monday evening. this means the new sub-panels near the 
electronics area, the dirty workshop, and the "kitchen" 
area will be energized and we can begin building branches 
out from them. 

   first priorities, roughly in order, are 
* remove extension cords 
* energize track over electronics work area 
* re-do wiring for track over workshop and classrooms 
* re-do wiring for tracks over central table columns area 
* finish receptacles on western wall (under the windows) 
* bring out essential pipes for lights for workshop and 
  classrooms as well as receptacles for classrooms 
* electrify photo darkroom (assuming stuff is moved away 
  from walls so we can walk and work there). 
* build out branches for dirty workshop, electronics, 
  chill area, classrooms, central column table area, 
  "kitchen" area.... 

   finishing out the electrical depends on people doing 
some of the work; currently we have the idea of someone 
"owning" a space. 
wrt electricity, what does it mean to own an area?
* determine where to put outlets, lights, light switches, 
  and appliances or tools. mark locations with removable 
  tape or some such. 
* do or delegate some of the work of installation (screw
  pipes and boxes to the walls, push wire into pipes and
  boxes, connect wires to receptacles, switches, and
  light fixtures, move existing lights as necessary, 
  install new appliances and lights as necessary).
owners: 
   Rubin owns central table columns area
   Rubin and Audrey own photo darkroom
   mitch and eric own electronics wall
   David owns chill space
   Shannon Lee and John Magolske own dirty workshop
   Crustcher and Jason D. own classrooms
   JSharp, Lamont, and Jim own library area
   jim owns entrance areas
   jim owns storage room
   miloh and maybe quinn own kitchen
missing:
  "dj" room
  south wall between storage room and double doors
  central western meeting area (lights and tracks)






More information about the Noisebridge-discuss mailing list