[Noisebridge-discuss] Kitchen update

Zedd Epstein zedd.00 at gmail.com
Tue Mar 2 21:45:41 UTC 2010


Copper is all in. We need a red and a black 8 or 10 guage wire ran to it,
then we have hot water. Power and a switch need to be run to the garbage
disposal. We also need power ran to the microwave cabinet above the
dishwasher, then down to the dishwasher.

I should be there around 4 to try and help with what I can, and pressurize
the hot water to make sure it doesn't leak.

Zedd
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://www.noisebridge.net/pipermail/noisebridge-discuss/attachments/20100302/25ee1da8/attachment-0002.html>


More information about the Noisebridge-discuss mailing list