This is clarifying: the plan is not to sand i.e. start over. The plan is 
to buff/roughen the surface and add two coats.
That is much better plan and far more doable in the time we have.

thanks for clarifying, and or my apologies for misunderstanding.

Neil

On 7/17/2014 10:48 AM, jim wrote:
>
>     Using an orbital floor sander will create much
> less dust than using a drum sander.
>     Given the need and use patterns, consider
> doing a one-pass light sanding job to prepare
> the floor surface for one or two more top coats.
>
>
>
>
>
> On 07/16/2014 10:03 PM, Torrie Fischer wrote:
>> That is the plan, yes. We need to acquire sheets and such like that, which I
>> held off on bringing together since I'd rather figure out what makes a good
>> plan for you. I'll call you tomorrow and see what we can figure out :)
>>
>> On Wednesday, July 16, 2014 20:46:48 neil maclean wrote:
>>> Hi Torrie,
>>>
>>> I'm no expert. I did sand the floors in my own flat. I was amazed at the
>>> unbelievable amount of dust the sander created. After it was over,
>>> everything needed a major cleaning. Before it started, I removed as many
>>> things as possible from the rooms.
>>>
>>> If you plan to sand NB in sections consider buying plastic sheets and
>>> taping off areas floor to ceiling where you'll be sanding to try to keep
>>> the dust in those areas.
>>>
>>> We can work together so we trade off work in different areas.
>>>
>>> Give me a call or lets try to meet so we can coordinate.
>>>
>>> Neil
>>> 415 515-8430
>>>
>>> On 7/16/2014 6:03 PM, Torrie Fischer wrote:
>>>> Hiya, Neil!
>>>>
>>>> I was planning on starting on sanding the floor Thursday evening to
>>>> refinish it, but if that would cause issues or introduce unnecessary
>>>> constraints please let me know. Its not a big deal to delay it 'till this
>>>> weekend.
>>>>
>>>> On Wednesday, July 16, 2014 17:59:22 jarrod hicks wrote:
>>>>> No worries, sanding the shop can wait.
>>>>>
>>>>> There are plans to sand the floors of part of the main space starting on
>>>>> Thursday evening, will this work as long as your tools are covered and
>>>>> away
>>>>> from the sanding zone?
>>>>>
>>>>> Torrie sent an email to the build list to check if starting on Thursday
>>>>> at
>>>>> 1800 was okay with everyone. I don't know if you are subscribed to that
>>>>> mailing list. I am copying Torrie on this message.
>>>>>
>>>>> On Wed, Jul 16, 2014 at 5:13 PM, neil maclean<neil at warmcove.org>  wrote:
>>>>>>    Hi Jerrod,
>>>>>>
>>>>>> I got most of the pipe installed in the shop today. I will get the rest
>>>>>> tomorow along with pulling the wire and putting on the covers. I'd ask
>>>>>> you
>>>>>> to refrain from sanding until after as the dust tends to get into
>>>>>> everything. If you really want to sand, please take my tools etc out of
>>>>>> the
>>>>>> space.
>>>>>>
>>>>>> thanks so much.
>>>>>> Neil
>>>>>>
>>>>>> On 7/6/2014 11:31 PM, jarrod hicks wrote:
>>>>>>    This schedule is rough and specific times on these have not been
>>>>>>
>>>>>> determined. I will provide access as best I can for volunteers who can
>>>>>> come
>>>>>> in to help with these tasks. Please let me know if you can help and
>>>>>> when.
>>>>>>
>>>>>>    W-09: Evening: Move things away from walls. Consolidate/purge
>>>>>>
>>>>>> tools. Make an inventory and shopping list for materials
>>>>>>
>>>>>>    R-10: Re-Frame Doors. Finish Drywall at openings. Patch as needed.
>>>>>>
>>>>>> Remove Hazards
>>>>>>
>>>>>>    F-11: Mud and Tape drywall. Bonus: Purge remaining. Remove Hazards
>>>>>>    
>>>>>>    
>>>>>>    S-12: Drywall second coat. Bonus: Tool repair/maintenance. Remove
>>>>>>    Hazards
>>>>>>    
>>>>>>    
>>>>>>    U-13: Sand and Paint walls, 2 coats. Sand and Paint doors. Bonus:
>>>>>>    Clear
>>>>>>
>>>>>> Shop (Arrange temp. workshop area)
>>>>>>
>>>>>>    M-14: Clear out Shop. Clean/Strip floors.
>>>>>>    
>>>>>>    
>>>>>>    T-15: (Pending electrical and flooring) Install/fix tables and
>>>>>>    Shelving.
>>>>>>
>>>>>> Replace tools. Install peg boards. Fix tool chests.
>>>>>>
>>>>>>    W-16: Label/Organize shelving. Setup project and art shelves.
>>>>>>    
>>>>>>    
>>>>>>    R-17: Create and install safety signage. Bonus: Tool
>>>>>>    repair/maintenance.
>>>>>>    Remove>
>>>>>>
>>>>>> Hazards
>>>>>>
>>>>>>    F-18: Create and install safety signage. Bonus: Tool
>>>>>>    repair/maintenance.
>>>>>>    Remove>
>>>>>>
>>>>>> Hazards
>>>>>>
>>>>>>    S-19: Time overrun allowance. Complete unfinished tasks. Remove
>>>>>>    Hazards
>>>>>>    
>>>>>>    
>>>>>>    U-20: Time overrun allowance. Complete unfinished tasks.
>>>>>>    
>>>>>>    
>>>>>>    July 19-Aug 1 Set up active ventilation. Purchase new
>>>>>>    tools/consumables.
>>>>>>    Build>
>>>>>>
>>>>>> scrap bin.
>>>>>>
>>>>>>    Considering that I have never done drywall work and will be learning
>>>>>>    as
>>>>>>
>>>>>> I go, anyone who can teach these skills would be really appreciated. It
>>>>>> would be a cool bonus if a short drywall installing, mudding, and taping
>>>>>> class could be held for others who are interested. Even so, anyone
>>>>>> willing
>>>>>> to learn/figure out how to do this with me is welcome.
>>>>>>
>>>>>>    I will be collecting whatever tools and materials we have for drywall
>>>>>>
>>>>>> work, and purchasing others. So if you need to do drywall/carpentry work
>>>>>> outside the shop they should be available in the space. If you have
>>>>>> tools
>>>>>> that can be lendt, please let me know as well, as well as any
>>>>>> recommendations for purchases/materials.
>>>>>>
>>>>>>    Cheers.
>>>>>>
>>>>>> -Jarrod
>>>>>>
>>>>>>
>>>>>> _______________________________________________
>>>>>> Build mailing
>>>>>> listBuild at lists.noisebridge.nethttps://www.noisebridge.net/mailman/listi
>>>>>> n
>>>>>> fo/build
>>>>>>
>>>>>>
>>>>>> _______________________________________________
>>>>>> Build mailing list
>>>>>> Build at lists.noisebridge.net
>>>>>> https://www.noisebridge.net/mailman/listinfo/build
>
>
>
> _______________________________________________
> Build mailing list
> Build at lists.noisebridge.net
> https://www.noisebridge.net/mailman/listinfo/build

-- 
if the Intelligence Community stopped breaking the law and lying to Congress and the public about it, whistleblowers would have no revelations to take to the media.

___


This communication may be unlawfully collected and stored by the National Security Agency (NSA) in secret. The parties to this email do not consent to the retrieving or storing of this communication and any related metadata, as well as printing, copying, re-transmitting, disseminating, or otherwise using it. If you believe you have received this communication in error, please delete it immediately.



---
This email is free from viruses and malware because avast! Antivirus protection is active.
http://www.avast.com
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.noisebridge.net/pipermail/build/attachments/20140718/a9ec4b7f/attachment-0003.html>


More information about the Build mailing list